Today’s work party was very successful and a lot of future infrastructure was put in place. We placed conduit buried to the driveway for a near future camera so members can check out the drive way condition. Also conduit was run to the telephone pole to move the inverted L over to the wooden telephone pole. And finally a conduit was put in place to that empty far tower so we can put an antenna on top of it.
Thanks go out to:
Chuck, Art, Karl, Nate, Tim, Dave, Joe
Click on image to see the full size picture. The next button is on the top right size: